A short time-lapse video showing the bridge structure being lifted into place. The bridge – crossing the River Clyde in Glasgow – was built in 2010 as part of the northern extension of the M74.
June 2010 (1 min)
A short time-lapse video showing the bridge structure being lifted into place. The bridge – crossing the River Clyde in Glasgow – was built in 2010 as part of the northern extension of the M74.
June 2010 (1 min)